-
Planned Concrete Utilization: Equivalent to 17 Olympic-sized swimming pools
-
Estimated Electrical Cable Installation: 757 km (far beyond Dubai to Abu Dhabi)
-
Planned Glass Panel Weight: 837,000 kg (about 2.2 times the weight of a Boeing 747)
-
Projected Brickwork Area: 38,000 m² (if stacked vertically, would reach 474 km high)
-
Building Structure & Built-up Area: 1 Ground, 3 Podium Levels, 19 Typical Floors + Roof; Built-up Area: 456,655 sq ft
-
Construction Start Date: 16 January 2025
-
Workforce Nationalities Represented: 15–20
-
Estimated Rebar Length: 4,900 km (enough to span the UAE multiple times)
-
Projected Building Weight: Approx. 5,950 tons (combined structural materials)
-
Rooftop Track Distance (Upon Completion): 51 laps = one full marathon
-
Estimated Total Man-Hours: 154,400 hours
-
Planned Landscaped Area: 605 m² (equal to three mini forests of 200 m² each)
-
Number of Elevators: 5 (travel a combined 1.74 km daily)




















































Have Any Questions?
Let’s Connect!
Register Your Interest
