Average Daily Workforce: 300 workers
-
Total Concrete Utilized: 25,000 m³ (enough to fill 10 Olympic-sized swimming pools)
-
Total Electrical Cables Installed: 445 km (beyond Dubai to Abu Dhabi)
-
Total Glass Panel Weight: 492,000 kg (about 1.25 times the weight of a Boeing 747)
-
Total Brickwork Area: 30,247 m² (if stacked vertically, would reach 378 km high)
-
Structure: 1 Ground, 1 Podium, 14 Floors + Roof; Built-up Area: 276,600 sq ft
-
Construction Start Date: 6 October 2023
-
Worker Nationalities Represented: Minimum 15
-
Safety Helmets Used Since Commencement: 16,000
-
Coffee/Tea Consumed by Workers: 372,500 cups
-
Total Meals Served: 410,200 meals
-
Total Rebar Length: 2,900 km (spanning far beyond Dubai to Muscat)
-
Total Building Weight: Approx. 3,500 tons (combined structural materials)
-
Rooftop Track Distance: 52.6 laps = half a marathon
-
Total Man-Hours Logged: 131,000 hours (equivalent to 3,638 round trips to the moon)
-
Total Landscaped Area: 3,914 m² (equal to 18 mini forests of 200 m² each)
-
Number of Elevators: 4 (travel a combined 1.18 km daily)



GOUND FLOOR - FOUNDATION CASTING

PREPARATION FOR PODIUM LEVEL VERTICAL ELEMENTS

EXCAVATION

EXCAVATION AND SURFACE LEVELING OF FOUNDATIONS AND UNDERGROUND WATER TANK

FOUNDATIONS CASTING IN PROGRESS

RAFT FOUNDATION PREPARATION AND PCC WORKS

PODIUM SLAB CONCRETING

SECOND FLOOR IN PROGRESS

SECOND FLOOR CONCRETE WORKS ONGOING

FOURTH FLOOR CONCRETE WORKS ONGOING

FOURTH FLOOR IN PROGRESS

SIXTH FLOOR CONCRETE CASTING

10th Floor Slab in Progress

10th Floor Slab in Progress

10th Floor Slab in Progress