Average Daily Workforce: 300 workers Planned Concrete Utilization: 25,000 m³ (enough to fill 10 Olympic-sized swimming pools) Estimated Electrical Cable Installation: 445 km (beyond Dubai to Abu Dhabi) Planned Glass Panel Weight: 492,000 kg (about 1.25 times the weight of a Boeing 747) Projected Brickwork Area: 30,247 m² (if stacked vertically, would reach 378 km […]

Average Daily Workforce: 220 workers Planned Concrete Utilization: 9,000 m³ (enough to fill 3.5 Olympic-sized swimming pools) Estimated Electrical Cable Installation: 205 km (equivalent to the distance from Dubai to Abu Dhabi) Planned Glass Panel Weight: 192,000 kg (around half the weight of a Boeing 747) Projected Brickwork Area: 12,147 m² (if stacked vertically, would […]