Construction Update: The Waterway by Prestige One

SCROLL
  • Planned Concrete Utilization: 15 Olympic-sized pools

  • Estimated Electrical Cable Installation: 460 km (Dubai → Abu Dhabi and beyond)

  • Planned Glass Panel Weight: ≈ 1.9 × Boeing 747

  • Projected Brickwork Area: 390 km stacked height

  • Workforce Nationalities Represented: 15-20

  • Estimated Rebar Length: 4,200 km

  • Projected Building Weight: 5,100 tons

  • Rooftop Track Distance (Upon Completion): 180 m = 48 laps (full marathon = 105.5 laps)

  • Estimated Total Man-Hours: 24,528

  • Planned Landscaped Area: 242 m² (1.2 mini forests)

  • Number of Elevators: 4 → 31.2 km daily travel