0

Loading ...

Construction Update: The Waterway by Prestige One

SCROLL
  • Planned Concrete Utilization: 15 Olympic-sized pools

  • Estimated Electrical Cable Installation: 460 km (Dubai → Abu Dhabi and beyond)

  • Planned Glass Panel Weight: ≈ 1.9 × Boeing 747

  • Projected Brickwork Area: 390 km stacked height

  • Workforce Nationalities Represented: 15-20

  • Estimated Rebar Length: 4,200 km

  • Projected Building Weight: 5,100 tons

  • Rooftop Track Distance (Upon Completion): 180 m = 48 laps (full marathon = 105.5 laps)

  • Estimated Total Man-Hours: 24,528

  • Planned Landscaped Area: 242 m² (1.2 mini forests)

  • Number of Elevators: 4 → 31.2 km daily travel

2K6A3753-HDR
The Waterway by Prestige One
The Waterway by Prestige One
The Waterway by Prestige One
The Waterway by Prestige One
The Waterway by Prestige One
The Waterway by Prestige One
The Waterway by Prestige One
The Waterway by Prestige One
The Waterway by Prestige One

Have Any Questions?
Let’s Connect!

Register Your Interest

Works Interest Registry
FOLLOW US