Construction Updates
The Residence by Prestige One
Technical Specifications
Key construction figures, materials and delivery benchmarks for The Residence by Prestige One.
Average Daily Workforce: 300 workers
Estimated Electrical Cable Installation: 205 km (equivalent to the distance from Dubai to Abu Dhabi)
Projected Brickwork Area: 12,147 m2 (if stacked vertically, would reach 140 km high)
Building Structure & Built-up Area: 1 Basement, 1 Ground, 5 Floors + Roof; Built-up Area: 163,300 sq ft
Estimated Rebar Length: 1,050 km (distance from Dubai to Muscat)
Rooftop Track Distance (Upon Completion): 200 m track = half a marathon after multiple laps
Planned Landscaped Area: 1,200 m2 (equal to six mini forests of 200 m2 each)
Planned Concrete Utilization: 9,000 m3 (enough to fill 3.5 Olympic-sized swimming pools)
Planned Glass Panel Weight: 192,000 kg (around half the weight of a Boeing 747)
Construction Start Date: 23 March 2024
Workforce Nationalities Represented: Minimum 15
Projected Building Weight: Approx. 1,200 tons (combined structural materials)
Estimated Total Man-Hours: 476,000 hours (equivalent to 1,322 round trips to the moon)
Number of Elevators: 2 (travel a combined 0.6 km daily)
Construction Gallery
Our Construction Work Process
Track how each construction stage progresses from planning to final handover.
Planning & Consultation
We align timelines, budget strategy, design intent and construction priorities with all stakeholders before on-site execution begins.
Design & Engineering
Architectural and engineering teams coordinate layouts, systems and technical details to ensure buildability, safety and performance.
Construction Execution
Core structure, MEP systems and finishes are delivered through controlled site management, quality checks and milestone-based reporting.
Inspection & Handover
Final inspections, compliance reviews and snag resolution are completed before handover, ensuring each home is ready to occupy.