Planned Concrete Utilization: 25,000 m³ (≈ 11 Olympic-sized pools)
-
Estimated Electrical Cable Installation: 275 km (Dubai → Abu Dhabi)
-
Planned Glass Panel Weight: 320,000 kg (≈ 1.75 × Boeing 747)
-
Projected Brickwork Area: 28,000 m² (stacked height 349 km)
-
Workforce Nationalities Represented: 10-20
-
Estimated Rebar Length: 3,000 km (Dubai → Muscat and beyond)
-
Projected Building Weight: 3,650 tons
-
Rooftop Track Distance (Upon Completion): 189 m = 50 laps (full marathon = 105.5 laps)
-
Estimated Total Man-Hours: 12,800
-
Planned Landscaped Area: 580 m² (3–4 mini forests)
-
Number of Elevators: 5 → 37.75 km daily travel