  • Planned Concrete Utilization: Equivalent to 17 Olympic-sized swimming pools

  • Estimated Electrical Cable Installation: 757 km (far beyond Dubai to Abu Dhabi)

  • Planned Glass Panel Weight: 837,000 kg (about 2.2 times the weight of a Boeing 747)

  • Projected Brickwork Area: 38,000 m² (if stacked vertically, would reach 474 km high)

  • Building Structure & Built-up Area: 1 Ground, 3 Podium Levels, 19 Typical Floors + Roof; Built-up Area: 456,655 sq ft

  • Construction Start Date: 16 January 2025

  • Workforce Nationalities Represented: 15–20

  • Estimated Rebar Length: 4,900 km (enough to span the UAE multiple times)

  • Projected Building Weight: Approx. 5,950 tons (combined structural materials)

  • Rooftop Track Distance (Upon Completion): 51 laps = one full marathon

  • Estimated Total Man-Hours: 154,400 hours

  • Planned Landscaped Area: 605 m² (equal to three mini forests of 200 m² each)

  • Number of Elevators: 5 (travel a combined 1.74 km daily)

Construction-updates-april-2026-golf-residences-
Construction-updates-april-2026-golf-residences-
Construction-updates-april-2026-golf-residences-
Construction-updates-april-2026-golf-residences-
place-construction-updates-mar-2026-
place-construction-updates-mar-2026-
place-construction-updates-mar-2026-
place-construction-updates-mar-2026-
place-construction-updates-mar-2026-
place-construction-updates-mar-2026-
the-place-construction-updates-feb-2026-
the-place-construction-updates-feb-2026-
the-place-construction-updates-feb-2026-
the-place-construction-updates-feb-2026-

Have Any Questions?
Let’s Connect!

Register Your Interest

Works Interest Registry
FOLLOW US