0

Loading ...

Construction Update: Coastal Haven by Prestige Harbour

SCROLL
  • Planned Concrete Utilization: 6 Olympic-sized pools (≈ 15,000 m³)

  • Estimated Electrical Cable Installation:210 km (enough to go Dubai → Abu Dhabi → Dubai)

  • Planned Glass Panel Weight: 300,000 kg (≈ 0.75 × Boeing 747)

  • Projected Brickwork Area: 25,600 m² (stacked height 45 km — 5× Mount Everest)

  • Workforce Nationalities Represented: Minimum 15

  • Estimated Rebar Length: 1,600 km (Dubai → Cairo)

  • Projected Building Weight: 3,300 tons

  • Rooftop Track Distance (Upon Completion): 152 m = 40 laps (full marathon = 105.5 laps)

  • Estimated Total Man-Hours: 5400

  • Planned Landscaped Area: 200 m² (1 mini forest)

  • Number of Elevators: 3 → 15.9 km daily travel

Coastal Haven by Prestige Harbour
Coastal Haven by Prestige Harbour
Coastal Haven by Prestige Harbour
Coastal Haven by Prestige Harbour
Coastal Haven by Prestige Harbour
Coastal Haven by Prestige Harbour
Coastal Haven by Prestige Harbour
Coastal Haven by Prestige Harbour
Coastal Haven by Prestige Harbour
Coastal Haven by Prestige Harbour

Have Any Questions?
Let’s Connect!

Register Your Interest

Works Interest Registry
FOLLOW US