Construction Updates
Luxury Canal Residences
Technical Specifications
Key construction figures, materials and delivery benchmarks for Luxury Canal Residences.
Planned Concrete Utilization: 6 Olympic-sized pools (~ 15,000 m3)
Planned Glass Panel Weight: 300,000 kg (= 0.75 × Boeing 747)
Workforce Nationalities Represented: Minimum 15
Projected Building Weight: 3,300 tons
Estimated Total Man-Hours: 5400
Number of Elevators: 3 -> 15.9 km daily travel
Estimated Electrical Cable Installation: 210 km (enough to go Dubai -> Abu Dhabi -> Dubai)
Projected Brickwork Area: 25,600 m2 (stacked height 45 km - 5x Mount Everest)
Estimated Rebar Length: 1,600 km (Dubai -> Cairo)
Rooftop Track Distance (Upon Completion): 152 m = 40 laps (full marathon = 105.5 laps)
Planned Landscaped Area: 200 m2 (1 mini forest)
Construction Gallery
Our Construction Work Process
Track how each construction stage progresses from planning to final handover.
Planning & Consultation
We align timelines, budget strategy, design intent and construction priorities with all stakeholders before on-site execution begins.
Design & Engineering
Architectural and engineering teams coordinate layouts, systems and technical details to ensure buildability, safety and performance.
Construction Execution
Core structure, MEP systems and finishes are delivered through controlled site management, quality checks and milestone-based reporting.
Inspection & Handover
Final inspections, compliance reviews and snag resolution are completed before handover, ensuring each home is ready to occupy.